ROADS, RAILS, BRIDGES
Independent Checking Engineer (ICE) For Damansara – Shah Alam Highway (DASH)
RBSB acts as an Independent Checking Engineer (ICE) for Damansara-Shah Alam Highway (DASH) that will be of 20.1-KM, three-lane, dual carriageway expressway starting from Puncak Perdana in Shah Alam to the Penchala interchange. The construction of DASH is to be started at mid of year 2016, with expected completion on 2020.

Central Spine Road
Central Spine Road (CSR) is one of the Malaysia government projects that are implemented under the East Coast Economic Region (ECER) Master Plan. CSR is approximately 60-KM in length with dual two carriageways.

Akleh Phase 2
Ranhill was appointed by Turnpike Synergy Sdn Bhd (Concession Company) to carry out the preliminary and detailed engineering design and construction supervision of AKLEH Phase 2. AKLEH Phase 2 involves the construction of a 1.4 Km fully elevated 3 lane extension from Jalan Jelatek Interchange to Middle Ring Road Interchange.

Muar Bridge and Bypass Project
The bypass road diverts traffic away from Muar Town, thus relieving traffic congestion. It is 632-KM cable-stayed bridge with a main span of 132-KM.

Senai – Desaru Expressway
Senai-Desaru Expressway is a 77-KM with dual-two expressway. It consists of six interchanges and two rest and service areas (RSA). Senai-Desaru Expressway connects Senai Airport in the West of Johor to Desaru in the East. The construction of its bridge involved a single-plane cable stayed bridge with total length of 1.7-KM and a navigational span of 500m crosses the Sungai Johor.

Senai – Desaru Expressway

South Klang Valley Expressway(SKVE)
The 52-KM South Klang Valley Expressway consists of eight interchange, six toll plazas and two rest & service areas (RSA). SKVE connects Putrajaya to Pulau Indah.

Malaysia-Singapore Second Crossing
The 2.1km bridge connecting Malaysia and Singapore is an alternative to the existing causeway. The bridge main span is 165m wide with cast-in-situ box girder segments and the approaches consist of precast box grinder segments.

Second Penang Bridge
Second Penang Bridge is the second-longest sea-crossing bridge in Malaysia and the fifth-longest in Southeast Asia. The bridge is 24-KM in length with a dual carriageway toll bridge. The bridge has been opened for public on March 2014.

LRT System 2 Kuala Lumpur
RBSB successfully concluded the detailed design of the five underground stations, a 6 km-long cut & cover tunnel along Sg. Klang and electrification of the whole system.

Aerotrain
The aerotrain shuttles passengers between the Main Terminal Building and Satellite Building of Kuala Lumpur International Airport.
Electrified Double Track Rawang – Ipoh
The 180 km Rawang-Ipoh Tracking is one of the most extensive railway infrastructure projects in Malaysia. RBSB designed 110 km of the project between Rawang and Bidor complete with bridges, yards and stations without disrupting the operations of Keretapi Tanah Melayu( KTMB).
Other Projects
• Trip Generation Study in Malaysia
• Bridge Capacity Determination Project, Malaysia
• Ulu Yam Baru – Ulu Gombak Road, Selangor
• Dedicated Highway to Kuala Lumpur International Airport
• Kuantan – Pekan Road Rehabilitation, Pahang
• Improvement of Jalan Gopeng with Segmental Box Girder Bridge, Perak
• KL Sentral Traffic Dispersal Study with Segmental Box Girder Bridge
• Shah Alam Expressway, Selangor
• Pendang Interchange, Kedah
• Ladang Bertam Interchange, Penang
• Jalan Jelatek Interchange, Kuala Lumpur